C05-LT Specifications
| Power Rating | 100 W |
|---|---|
| Test Item | Recommended for PEM single cells from 5 cm² to 25 cm² active area Fuel cell fixture Connection cables provided |
| Size | Fully integrated test stand system Dimensions: 570 x 570 x 845 mm high |
| Weight | Ca. 110 kg |
| Safety | Inbuilt PILZ safety PLC and independent safety control Automatic fail-safe nitrogen purge, initiated in alarm condition. Layered safety features & alarms External LEL Alarm connectivity |
| Regulatory Compliance | CE Certified RoHS Compliance |
| Humidification | 2-stage heating for optimised gas saturation performance Water auto-fill & auto-levelling |
| Trace Heating | Heating hoses from test stand to item for precise and continuous gas control |
| Back Pressure | Manual adjustment back-pressure control atmospheric to 3.4 barg Back pressure real-time monitoring via PLC & TestWork |
| Exhaust | Automatic condensate & gas exhaust |
| Test Capability | Nitrogen cross-over capability inbuilt Manual or automatic control via TestWork Complete flexibility in test sequence creation |
| Electronic Load | Current Range: 0 – 100 A Voltage Range: 0 – 6 V Minimum Voltage: 0.0 V (zero-volt functionality included) |
| Software | TestWork Enterprise software & license included Test Sequence templates included: Test Initialisation, LSV, CI, Break-In, Recovery, Polarisation Curve |
| PC | PC, monitor & peripherals with TestWork pre-installed |
C05-LT Optional Features
| Potentiostat | CYV Potentiostat with HORIBA Enclosure (no additional floorspace required) |
|---|---|
| EIS | Electrochemical impedance spectroscopy (EIS) testing capability |
| Automatic Back Pressure | Automatic BPR with control & monitoring through TestWork |
| Independent Fuel Cell Heater Control Loops | Anode & Cathode independent fuel cell fixture control |
| Heated Line Transitional Heaters | Additional heated jackets between heated line outlet and fixture inlet |
| Fuel Cell Fixture | 5-25 cm2 Fuel Cell Fixture |




